#apollo_spacecraft_feasibility_study
Apollo spacecraft feasibility study
Various NASA plans for a successor to Project Mercury
The Apollo spacecraft feasibility study was conducted by NASA from July 1960 through May 1961 to investigate preliminary designs for a post-Project Mercury multi-crewed spacecraft to be used for possible space station, circum-lunar, lunar orbital, or crewed lunar landing missions. Six-month, $250,000 study contracts were awarded to General Dynamics/Convair, General Electric, and the Glenn L. Martin Company. Meanwhile, NASA conducted its own inhouse design study led by Maxime Faget, intended as a gauge of the competitors' entries. The three companies spent varying amounts of their own money in excess of the $250,000 to produce designs which included a re-entry module separate from the mission module cabin, and a propulsion and equipment module.
Tue 10th
Provided by Wikipedia
This keyword could refer to multiple things. Here are some suggestions: